Mining
Production drilling, exploration, and brownfield fleet replacement with documented ground-condition assumptions. Typical scope covers 76-165 mm blasthole diameters, bench heights of 10-15 m, UCS ranges up to 250 MPa, and fleet utilisation targets above 82 percent. Deliverables include rotary-head torque curves, mast verticality tolerance, and dust-suppression compliance notes.